Ticker

WIASS and
partners are
promoting a
social pv-project
in Tansania
Please help us
Donation account:
Unicredit
PV for Africa
Bank code:
790 200 76
Account number:
378 228 085
A disruption during the construction phase can have several causes.
For example, it is possible for disruption to be caused by any of the following:
The special form of business interruption insurance for the construction period covers delays to the initial use of a plant or piece of equipment due to property damage during installation.
In conjunction with a construction risks insurance policy, it is possible to provide your project with comprehensive coverage, so that costs for numerous measures can be covered during the liability period.
Our concept provides cover for losses caused by interruptions if they are due to property damage caused by: